The Details

Contract worth: 265.000 €
Work description: The design and construction of the pipe system

Facility: Tigar Pirot Serbia
Date: 11.2013 – 07.2014
Number of workers deployed: 16

About The Project

  • Date:25th June 2018
  • Category:
  • Likes: 0 like
  • Share: