The Details

Contract worth: 414.000 €
Work description: Work on the pipe system in the blocks A1 and A3

Facility: Thermal power plant TENT A
Date: 07.2014 – 12.2014
Number of workers deployed: 50

About The Project

  • Date:26th June 2018
  • Category:
  • Likes: 0 like
  • Share: