The Details

Contract worth: 334.000 €
Work description: Overhaul of boiler piping system

Facility: Thermal power plant Manheim
Date: 05.2013 – 11.2014
Number of workers deployed: 10

About The Project

  • Date:26th June 2018
  • Category:
  • Likes: 0 like
  • Share: