The Details

Contract worth: 115.000 €
Work description: Overhaul of boiler piping system and rotary air heater at TE KO A2

Facility: Thermal Power Plant Kostolac A
Date: 15.07.2015 – 30.09.2015
Number of workers deployed: 25

About The Project

  • Date:25th June 2018
  • Category:
  • Likes: 0 like
  • Share: